Skip to content
TownbriefOrleans
Sign in Subscribe
Tuesday, November 3, 2026 Orleans, Massachusetts · Change town
Government · Conservation

Orleans Conservation Commission approves Grieco pool, Roberge seawall work in unanimous votes

Orleans Conservation Commission continues lakeside teardown, approves pool and seawall work in packed April 7 session. The six-member commission, chaired by Drusilla Henson with Conservation Agent John Jannell, voted 6-0 on all formal actions at its April 7 meeting in the Nauset Room.

Email Text Facebook X

ORLEANS -- April 7, 2026, Orleans Conservation Commission continues lakeside teardown, approves pool and seawall work in packed April 7 session. The six-member commission, chaired by Drusilla Henson with Conservation Agent John Jannell, voted 6-0 on all formal actions at its April 7 meeting in the Nauset Room. The most contentious item, a proposal by John and Meghan Lyons to demolish a 1956 cottage at 169 Monument Road on Pilgrim Lake and replace it with a taller two-story dwelling shifted roughly 14 feet landward, was continued to April 21 after commissioners raised concerns about a 3,274-cubic-foot volume increase, a ridge height rising from 32.4 to 41.2 feet, stormwater controls on a steep driveway, and the project's position entirely within the Pleasant Bay Area of Critical Environmental Concern; Henson called approval "just very difficult" without heavier mitigation. The commission approved a pool, patio, and garden shed for Scott and Diane Grieco at 24 Camp Road subject to conditions requiring a minimum 25-foot no-mow wetland buffer with physical delineators, stormwater drains directed to dry wells, and pool drawdown to be trucked off site. Commissioners also approved a revised plan request for Michael and Tracy Roberge at 27 Cheney Road, authorizing an extension of in-water work limits to remove a 1961-era concrete seawall footing discovered under established salt marsh, conditioned on a Wilkinson Ecological Design monitoring protocol covering two full growing seasons of salt marsh recovery, work must be complete by April 24.

Members read the rest of this story and every Orleans meeting we cover, in full.

Become a member

A 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms

Share this story

Email Text Facebook X

Know someone in Orleans who follows town government? Share Townbrief Orleans: they can sign up free.

Share this story

Email Text Facebook X

Anyone can open a shared story. Members' stories show the free part and a sign-up line to people who are not members.