Sign in Subscribe

Fire Station Design Committee Moves Forward with Four Architectural Concepts

Fire-Rescue Building Committee · Meeting of March 23, 2026

ORLEANS — Fire-Rescue Building Committee reviews four fire station designs as project advances. The committee examined four architectural massing concepts — Net Zero, Police Replica, Transitional, and Two Gables — for the proposed fire station during its March 23 meeting, with geotech soil borings scheduled to begin March 26. Fire Chief Geof Deering raised operational concerns about certain designs' efficiency, while committee members discussed preferences ranging from the Transitional and Two Gables aesthetics to the modern Net Zero concept.

Kathy McNamara, Select Board Chair, emphasized that the committee focus on public outreach and securing Annual Town Meeting support rather than making immediate design decisions. Public open houses are scheduled for March 25, March 30, April 7, April 15, and April 24 at the Fire Station.

In the full story:

  • The complete report — 363 words

Source: the Fire-Rescue Building Committee meeting of March 23, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to Orleans News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Orleans News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe